As part of the Room for the River programme, the Vallei en Veluwe Water Board has initiated the construction of a flood channel between Veessen and Wapenveld over the coming years.

This is an 8-kilometre-long “dry” riverbed that will flow with the river during extremely high water levels on the IJssel (expected once in a lifetime).

In February 1995, the water of the IJssel reached the tops of the dykes. This historic event marked the start of a new way of thinking about flood safety. The artwork “The Heartbeat of the IJssel” depicts this story of cause and effect of the “Room for the River” policy and of the Veessen-Wapenveld flood channel in particular. Every three years, the water levels of the IJssel from the previous three years are added to the next bridge segment of “The Heartbeat of the IJssel”.

When the bridge is completed in 2015, the first “20 years” will be filled with measuring points. These measuring points consist of oval “drops” of high-gloss stainless steel. In the dark space under the bridge, the rhythm of the river sparkles towards you. It will take about a “human lifetime” to complete this work of art, which will then be 780 metres long. So there is a very good chance that the flow of the Hoogwatergeul will be recorded at least once in the artwork! “The Heartbeat” shows the passage of time in a sober and understated way, based on the rhythm of the river.

Functionality and art go hand in hand; the dark space under the bridge takes on meaning, even though most of the time there is no water flowing.

Commissioned by:
GMB
In collaboration with:
VHA Architects, BoschSlabbers Landscape Architects, Bureau Stroming
Location:
Veessen Wapenveld
Year:
2015
Status:
research by design

THE STORY